Town of Milliken

Town of Milliken

Since 2008, Lamp Rynearson’s Fort Collins office has supported the engineering needs of the Town of Milliken. In 2014, the Town reaffirmed its selection of our firm through a competitive selection process, and expanded the engineering services to include water and wastewater projects. Since then, TZA has supported a number of water and wastewater projects, including:

  • Wastewater Utility Plan Preparation
  • South Storage Tank Addition (1.0 Million Gallon Bolted Steel Tank)
  • Cherry Street Cured-In-Place-Pipe Sewer Rehabilitation
  • East Side Loop Water Distribution (2.5 miles) and Sewer Collection (1.25 miles) Extensions
  • Broad Street Water Line Replacement
  • Mad Russian Lift Station Regulatory Approvals